Zenilify Consulting Zenilify Consulting

Operational excellence, digital transformation, manufacturing

From the sensor on the floor to the alert on your phone, in 26 seconds.

Pilots that survive the shop floor.

Most digital projects die between the dashboard and the machine. I build the ones that don't, because I have owned the P&L they were meant to improve.

The problem is rarely the technology.

Scrap, rework, complaints and a stalled Industry 4.0 pilot are the same thing: an operations problem with a dashboard on top. Fixing the symptom costs you twice.

Three things I am useful for

Make the plant visible

Sensors, an edge box, one dashboard, alerts on your phone. Fixed scope, fixed price, handed to your team.

Get the pilot to the machine

Roadmap, pilot cell, scale plan, OT/IT integration. The data lands in the daily meeting, not on a wall.

Make the numbers move

Cost of poor quality, OEE, audit readiness, suppliers, recalls. The discipline that keeps the gain.

How it works

1

Diagnostic call

One process, one honest read. You get a follow-up note either way.

Free, 30 minutes
2

On-site deep dive

Plant walk, one real pain point, a quick win, a quotation with a 12-month roadmap.

MXN 1,000 per hour on site, plus travel
3

The work

Alongside your team, handing over controls they run without me.

If I am still needed in a year, something went wrong

Services

Illustration: a small plant with sensors on the compressor and the cold room, one edge box, an alert on a phone

Smart building and IoT pilots

Make the building tell you what it is doing. Scoped to finish, not to subscribe.

  • Site visit and written scope before anything is bought
  • Sensors and an edge box installed and labelled
  • One dashboard, alerts tuned on your data, full handover
More detail
  • Nobody knows what the compressor costs, which room is cold, or that the freezer drifted for six hours on a Sunday. The instrumentation is cheap now; the reason it does not get installed is that nobody wants to own a half-finished system.
  • Handover means documentation, credentials and an hour of training. It is yours.
  • Fixed scope, fixed price, quoted after the on-site deep dive. Not residential smart home, not a monthly platform fee, not a system only I can maintain.
Illustration: one pilot cell on the left, three production lines on the right, data flowing into a meeting room screen

Digital transformation and Industry 4.0

The pilot is easy. Scaling it to the second line is the job.

  • A roadmap tied to money and risk, not a capability matrix
  • A pilot cell chosen because it is representative, not easy
  • A scale plan written at the same time as the pilot
More detail
  • Most programmes produce one impressive cell and one disappointed steering committee, because the plan was written by people who had never carried the plant's numbers. I have.
  • OT/IT integration, and data that lands in the daily management meeting.
  • Where a pilot touches the machine (PLC, SCADA, MES/ERP validation), a specialist integrator is named in the quotation with written responsibilities.
Illustration: a quality lab bench next to a wall chart of cost of poor quality going down month by month

Operational excellence and quality

Where quality starts being money: one number that moves the budget conversation.

  • Cost of poor quality, found and closed with controls your team runs
  • Audit readiness: FSSC 22000, BRCGS, IFS, customer audits
  • OEE and daily management, supplier and toller performance
More detail
  • Crisis and recall: containment, root cause, communication, and the fix that stops the repeat.
  • Interim leadership: plant startups, transitions, covering a quality or OpEx seat while you hire.
  • A COPQ or audit-readiness programme runs 6 to 12 weeks; interim and advisory work is a monthly retainer. Both are quoted after the deep dive.

Everything I sell, I run.

Kaizen Lab is the technical division: sensors, edge, dashboards, alerting and backups in a real house, every day, shown live on a call. Failure modes get found on my time, not yours.

Three numbers the lab publishes every day

…Service availability, last 30 days
…Improvement ideas implemented
…Days in a row with every backup green

The numbers are live at kaizen-lab.io

Your browser reads them straight from kaizen-lab.io. No cookies, no ads. Read the bakery case →

Erick Hernandez Zenil

I have been on the other side of the quotation.

R&D, pilots to scale, CAPEX, then a plant P&L and an EVP seat. That is where operational excellence stopped being a method and became money.

  • Dipl.-Ing. Food Technology, TU München
  • Germany, Switzerland, Mexico
  • DE, EN, ES
  • Toluca and Mexico City, travels

I have sat in the HQ meeting where the standard is written and in the plant meeting where somebody has to make it work on a Tuesday. Full profile and contact card →

Let's find the money hiding in your operations data.

Thirty minutes, one process, one honest read.

  • No mail app? Write to contacto@zenilify-consulting.com
  • WhatsApp +52 55 3018 5656
  • Toluca
  • Mexico City
  • remote
  • ES / EN / DE